To date, our people have successfully been involved and seen through to completion a number of projects amongst which are;

Globacom LTE Phase 7 installation project across LAGOS STATE. (2017)
 Globacom Phase 7 swap and expansion project in ABIA , IMO, ANAMBRA and RIVER STATES: decommissioning and back hauling of ZTE materials. (2016 – 2017)
Delivery of Globacom engineering materials for ABIA, IMO and BAYELSA STATE (2016- 2017 ).
Technical Audit of NATCOM manholes acquired from NITEL across Lagos State (2015)
FY 14 AIRTEL project sub- contractor: link- installation :(ericsson mini link 20p,6p,2p magazine), 0.6 and 1.2 microwave radio dish installation, installation of RBS 6000 series.
FY 13 MTN project sub -contractor: link- installation: (ericsson avait magazine), 0.6 microwave radio dish and installation of RBS series.
Fabrication of canopy and mounting pole for roof top airtel site. (2014)
Upgrading of AIRTEL burn site
Civil works for EMTS/ALU green field sites from 2010 – 2011
 B5504 Ilesan Ogun State,
 B5550 Elume Juction Delta State,
 B5535 Eyekorin Kwara State,
 B3903, Ogohgoh Street Benin City,
 B4202 off Adebayo road Ado ekiti 2010
Design and Construction of Cell Towers (2005 -2007) for:
 Celtel Nig. Ltd (Airtel)/ LM Ericcson Ltd at Ogbomosho (45m, 60m)
 Celtel Nig. Ltd (Airtel)/ LM Ericcson Ltd at Oniparaga, Edo State (60m)
 Celtel Nig. Ltd (Airtel)/ LM Ericcson Ltd at Seme Border, Badagry with special pile foundations (60m)
 Celtel Nig. Ltd (Airtel)/ LM Ericcson Ltd at Owode-Apa, Badagry with special pile foundations (60m)
Construction of 45m Cell Tower at Backo Compound, Ojodu, Ikeja (inclusive of integrated block wall fencing and access steps)
Maintenance and routine service of Air conditioning units and Generators for Castor Logistics Limited, Truck yard, Isheri, Lagos (2010 – 2014)
Maintenance and routine service of Air conditioning units and Generators for St. Pauls Hospital, Ebutte- Metta, Lagos (2009 – 2012)
WordPress Theme